Projects

Transferring of Chemicals From Tanker

transferring-of-chemicals-from-tanker-image-1
transferring-of-chemicals-from-tanker-image-2

This project required transferring of Brine from a chemical tanker to a cooling tower 20m above. The Brine is used in a hi-technology semiconductor facility in Singapore for the purpose of cooling the building. One unit of a 20kW Sykes pump was used for the project which emptied 20 tankers full of brine into the facility. The project took 20 hours, and was completed on February 10th 2007.

Technical Specifications of Project:

  • Pump Type: Sykes 4″ Autoprime Pumps
  • Pump flow rate: 200m³/hr
  • Pump pressure: 20m lift
  • Engine: Deutz F2L912 20kW diesel engine
  • Tanker Capacity: 10,000 liters
Designed by Web Design Singapore