This project required 6 units of 40kW pumps. A number of our skilled engineers were dispatched for this particular project and it was completed within a time frame of 2 days. Sea water from outside the barge was pumped into the barge to balance it while heavy load from the other side of the barge was taken off. The seawater acts as a counterweight to stabilize the barge.
Technical Specifications of Project: